Lalo's Tile & Coping

Denton / Pool Renovation

Pool Renovation in Denton

Full pool remodels in Denton. New tile, coping, and stonework on a sound shell, done as one project.

If you are looking at a pool renovation in Denton, the pool itself is probably fine. The shell holds water and the plumbing works, but the finishes are worn out: tile popping in several spots, coping cracked or shifting, grout failing, and the whole pool reading dated. A remodel brings it back without the cost of a new build, and that is what we do.

We have remodeled pools across DFW for 20 years. A Denton renovation usually combines a retile or full retile, new coping, grout restoration, and stonework around the deck, with bond beam repair where the pool needs it. We scope to the pool in front of us. If part of it is still solid, we leave it and say so. We also redo a fair amount of work that did not hold, tile set with the wrong adhesive or coping put in without an expansion joint.

The savings come from doing it on one drain. One crew, one timeline, and the tile, coping, and stone all matched by the same hands instead of pieced together across separate years. Everything goes in to PHTA standards with real expansion joints and proper prep. A tile and coping remodel typically runs $5,000 to $12,000 over 1 to 2 weeks. Add interior surface work and it is $10,000 to $25,000 and 3 to 4 weeks. A remodel is also the moment to update the rest of the yard, an outdoor kitchen or new patio stone, matched and built together.

We renovate pools throughout Denton and Denton County, and also handle pool renovation in Frisco nearby. Want a real number for your pool? Fill out the form for a free on-site estimate. We measure it, we quote it. Builders putting in a new pool can reach out for the tile and coping install as well.

FAQ

Frequently asked questions

A tile and coping remodel typically runs $5,000 to $12,000. Add interior surface work and most land in the $10,000 to $25,000 range. Pool size and materials move the number. We quote a fixed price after seeing the pool.

When tile is popping in several spots, the coping is cracking or shifting, and the whole pool looks dated, that is renovation territory. If it is one cracked tile or a single lifted stone, a repair handles it. We look and tell you honestly which way to go.

A tile and coping remodel is usually 1 to 2 weeks. A full renovation with surface work runs 3 to 4 weeks. We give you the timeline before we start and keep you posted.

Regularly. Wrong adhesive, missing expansion joints, bad prep. We tear out what failed, fix the cause, and rebuild it so it holds.

Blog

Pool Renovation Insights

Pool tile and coping insights from over 20 years working across Dallas-Fort Worth.

Call