Lalo's Tile & Coping

Colleyville / Pool Renovation

Pool Renovation in Colleyville

Full pool remodels for Colleyville. New tile, new coping, and stonework on a sound shell, done as one project.

When people search for a pool renovation in Colleyville, the pool itself is usually fine. The shell holds water and the plumbing works. What has worn out is the surface: dated or popping tile, a cracked and shifting cap, tired grout, and stonework around the deck that no longer matches the rest of the yard. A remodel resets all of that without the cost of a new build.

We have remodeled pools across DFW for 20 years. This is the heart of what we do, and on Colleyville estate pools it often runs wider than the pool, with the deck, patio, and surrounding stone tied into one plan so the finishes read as one space.

A renovation here is usually a retile or full retile, new coping, grout restoration, and stonework, with bond beam repair where the pool needs it. The savings come from doing it on one drain with one crew, so the tile, coping, and stone are matched by the same hands instead of pieced together over separate years. A tile and coping remodel typically runs $5,000 to $12,000 over 1 to 2 weeks. Add interior surface work and most land between $10,000 and $25,000 over 3 to 4 weeks. Everything goes in to PHTA standards with real expansion joints and proper prep, so it holds for the next stretch of seasons. We scope to the pool in front of us, and if part of it is still solid we leave it and say so.

We renovate pools throughout Colleyville and nearby. Want a real number for your pool? Fill out the form for a free on-site estimate. We walk the pool, measure it, and quote it. Compare with our pool renovation in Southlake, or see the full range in Colleyville. Building a new pool and want the tile and coping installed? Reach out.

FAQ

Frequently asked questions

A tile and coping remodel typically runs $5,000 to $12,000. Add interior surface work and most land between $10,000 and $25,000. Pool size and materials move it. We quote a fixed number after seeing the pool.

Tile and coping is usually 1 to 2 weeks. A full renovation with surface work runs 3 to 4 weeks. We give you the timeline before we start and keep you posted.

Almost always at this age. The shell and plumbing are usually still good, so new tile, coping, and stone make it look new for a fraction of a replacement and last another long stretch.

Regularly. Wrong adhesive, missing expansion joints, bad prep. We tear out what failed, fix the cause, and rebuild it so it holds.

Blog

Pool Renovation Insights

Pool tile and coping insights from over 20 years working across Dallas-Fort Worth.

Call